Webster 1 Light 12 inch Weathered Brass Semi-Flush Mount Ceiling Light
Webster 1 Light 12 inch Weathered Brass Semi-Flush Mount Ceiling Light
$144.00
Choose options for pricing

Webster 1 Light 12 inch Weathered Brass Semi-Flush Mount Ceiling Light

SKU: WBS1712WS
  • Non-Returnable

Webster 1 Light 12 inch Weathered Brass Semi-Flush Mount Ceiling Light

SKU: WBS1712WS
  • Non-Returnable
$144.00
(Only 7 in stock!)
Free Shipping!


Free 2-day Delivery Available
Enter your ZIP Code to check your eligibility:
Please enter a valid zip code
You're Eligible for Free 2-day Delivery!
This item is [not] eligible for 2-day delivery based on your location: [computedDestination]
Server Error

In stock items ship in 1-2 business days.

Discontinued


This item is no longer available, but our Lighting Experts will be happy to help you find something similar that will suit your style, space and budget.

866-344-3875
Live Chat

Are you a Trade Professional?

Log in to your LNY Pro account, or sign up here to receive exclusive trade pricing and other Pro benefits today!

Love the look of this product?

Recommended by LNY, Powered by Beacon
You must be logged in to create a Project and add items. Log In or Create an Account
Please fully select a product before adding it to your projects
call and speak with a Lighting Expert

Our Experts Help You Every Step of the Way

Our Lighting Experts can help you find the brand that best suits your style & budget.

  • 150% Price Match Guarantee
  • Info on Our Pro Program
  • Expert Answers to Your Questions
  • Call for Best Pricing

Available 7 days a week, 8am to midnight


866-344-3875


Live Chat

Webster 1 Light 12 inch Weathered Brass Semi-Flush Mount Ceiling Light

Description

As a pendant, Webster casts a smart and tidy glow thanks to its clear glass shade. This industrial-inspired piece offers a subtle radiance and patina thanks to its weathered brass finish. Webster is also available as a semi-flush mount or larger island light.

Product Specifications

Product Information

Brand:
Quoizel
Brand Category:
Semi-Flush Mount
Brand Product Description:
Webster Semi-Flush Mount
Shipping Method:
Ground
SKU:
WBS1712WS
UPC:
611728345696

Electrical and Operational Information

Lamping Included:
Bulbs Not Included
Lead Wire Length:
8 Ft
Primary Number of Bulbs:
1
Socket:
Medium Base
Total Number of Bulbs:
1
Voltage:
120
Wattage Max:
100.00

Dimensions and Measurements

Backplate/Canopy Height:
5
Backplate/Canopy Width:
5
Height:
14.75
Length:
12
Weight:
5.00
Width:
12

Warranty and Specifications

UL Ratings:
ETL Listed

Additional Details

Features:
  • Shade 1 Measurements: 4 Top 12 Bottom 10.75 Side
Glass Features:
Clear Glass
Material:
Steel

Product Reviews


About the Brand


Quoizel offers decorative lighting for the inspired home through high-quality craftsmanship, thoughtful designs, and timeless style.