Two Circuit Monorail Chrome Rail S Curve Ceiling Light
Image shown is not an exact match for the product or options you’ve selected
- Non-Returnable
Two Circuit Monorail Chrome Rail S Curve Ceiling Light
Discontinued
This item is no longer available, but our Lighting Experts will be happy to help you find something similar that will suit your style, space and budget.
Our Experts Help You Every Step of the Way
Our Lighting Experts can help you find the brand that best suits your style & budget.Two Circuit Monorail Chrome Rail S Curve Ceiling Light
Description
Two-circuit MonoRail bends very easily by hand to almost any imagineable shape, but the pre-bent S curve makes Two-Circuit Monorail even easier to install. Pre-bent into a horizontal S Curve. Consult drawing for approximate dimensions. Rated for 300 watts per circuit at 12 volts. Each piece of rail is shipped with conductive connectors to join rail pieces end to end. Order additional connectors if cutting and rejoining rails.
Product Specifications
Product Information
- Brand:
- Visual Comfort Modern Collection
- Brand Category:
- Rail S Curve
- Shipping Method:
- Ground
- SKU:
- 700MO2BHSC60C
- UPC:
- 0756460858995
Electrical and Operational Information
- Lamping Included:
- Bulbs Not Included
Dimensions and Measurements
- Dimensions:
- Pre-bent S-curve
- Length:
- 0.3
- Maximum Adjustable Height:
- 0.9
- Weight:
- 1.65
- Width:
- 0.3
Warranty and Specifications
- Country of Origin:
- China
- UL Ratings:
- ETL
Additional Details
- Features:
-
- MO2-Horiz S-Curve clear, ch
- Glass Features:
- Clear
- System:
- Two-Circuit MonoRail
Product Documentation
About the Brand
With a passion for innovation, original design and uncompromising quality, the Visual Comfort Modern Collection delivers iconic and timeless indoor and outdoor lighting solutions for the spaces in which people live, work, and play.