Monorail Antique Bronze Rail S Curve Ceiling Light
Monorail Antique Bronze Rail S Curve Ceiling Light
$325.00
Choose options for pricing

Monorail Antique Bronze Rail S Curve Ceiling Light

SKU: 700MOBHSC60BRZ
  • No Restocking Fee

Monorail Antique Bronze Rail S Curve Ceiling Light

SKU: 700MOBHSC60BRZ
  • No Restocking Fee
$325.00
(100+ in stock)
Free Shipping & Returns!


Free 2-day Delivery Available
Enter your ZIP Code to check your eligibility:
Please enter a valid zip code
You're Eligible for Free 2-day Delivery!
This item is [not] eligible for 2-day delivery based on your location: [computedDestination]
Server Error

In stock items ship in 1-3 business days.

Discontinued


This item is no longer available, but our Lighting Experts will be happy to help you find something similar that will suit your style, space and budget.

866-344-3875
Live Chat

Are you a Trade Professional?

Log in to your LNY Pro account, or sign up here to receive exclusive trade pricing and other Pro benefits today!

Love the look of this product?

Recommended by LNY, Powered by Beacon
You must be logged in to create a Project and add items. Log In or Create an Account
Please fully select a product before adding it to your projects
call and speak with a Lighting Expert

Our Experts Help You Every Step of the Way

Our Lighting Experts can help you find the brand that best suits your style & budget.

  • 150% Price Match Guarantee
  • Info on Our Pro Program
  • Expert Answers to Your Questions
  • Call for Best Pricing

Available 7 days a week, 8am to midnight


866-344-3875


Live Chat

Monorail Antique Bronze Rail S Curve Ceiling Light

Description

MonoRail pre-bent into a horizontal S curve. Consult the drawing for approximate dimensions. For a factory bend not shown, please call for a custom quotation.

Product Specifications

Product Information

Brand:
Visual Comfort Modern Collection
Brand Category:
Rail S Curve
Shipping Method:
Ground
SKU:
700MOBHSC60BRZ
UPC:
756460993795

Electrical and Operational Information

Lamping Included:
Bulbs Not Included

Dimensions and Measurements

Dimensions:
Pre-bent S-curve
Length:
0.3
Maximum Adjustable Height:
0.6
Weight:
1.10
Width:
0.3

Warranty and Specifications

Country of Origin:
China
UL Ratings:
ETL

Additional Details

Features:
  • MO-Horiz S-Curve brown, bz
Glass Features:
Brown
System:
Monorail

Product Documentation


Product Reviews


About the Brand


With a passion for innovation, original design and uncompromising quality, the Visual Comfort Modern Collection delivers iconic and timeless indoor and outdoor lighting solutions for the spaces in which people live, work, and play.