Webster 1 Light 12 inch Weathered Brass Mini Pendant Ceiling Light, Small
Webster 1 Light 12 inch Weathered Brass Mini Pendant Ceiling Light, Small
Discontinued
Choose options for pricing

Webster 1 Light 12 inch Weathered Brass Mini Pendant Ceiling Light, Small

SKU: WBS1512WS
  • Non-Returnable

Webster 1 Light 12 inch Weathered Brass Mini Pendant Ceiling Light, Small

SKU: WBS1512WS

Discontinued


This item is no longer available, but our Lighting Experts will be happy to help you find something similar that will suit your style, space and budget.

866-344-3875
Live Chat
call and speak with a Lighting Expert

Our Experts Help You Every Step of the Way

Our Lighting Experts can help you find the brand that best suits your style & budget.

  • 150% Price Match Guarantee
  • Info on Our Pro Program
  • Expert Answers to Your Questions
  • Call for Best Pricing

Available 7 days a week, 8am to midnight


866-344-3875


Live Chat

Webster 1 Light 12 inch Weathered Brass Mini Pendant Ceiling Light, Small

Description

As a pendant, Webster casts a smart and tidy glow thanks to its clear glass shade. This industrial-inspired piece offers a subtle radiance and patina thanks to its weathered brass finish. Webster is also available as a semi-flush mount or larger island light.

Product Specifications

Product Information

Brand:
Quoizel
Brand Category:
Mini Pendant
Brand Product Description:
Webster Mini Pendant
Shipping Method:
Ground
SKU:
WBS1512WS
UPC:
611728344392

Electrical and Operational Information

Lamping Included:
Bulbs Not Included
Lead Wire Length:
8 Ft
Primary Number of Bulbs:
1
Socket:
Medium Base
Total Number of Bulbs:
1
Voltage:
120
Wattage Max:
100.00

Dimensions and Measurements

Backplate/Canopy Height:
5
Backplate/Canopy Width:
5
Height:
14.75
Length:
12
Weight:
6.30
Width:
12

Warranty and Specifications

UL Ratings:
ETL Listed

Additional Details

Chain Cord Features:
2 (0.5"D x 6") and 2 (0.5"D x 12") Down Rods
Features:
  • Shade 1 Measurements: 4 Top 12 Bottom 10.75 Side
Glass Features:
Clear Glass
Material:
Steel
Shape:
Cone

Product Reviews


About the Brand


Quoizel offers decorative lighting for the inspired home through high-quality craftsmanship, thoughtful designs, and timeless style.